Built for cargo that does not fit the template.
Halogis is a carrier-neutral forwarder focused on breakbulk, RoRo and project cargo leaving China.
The specialist forwarder behind Halogis.
Halogis is the international brand of Shanghai Langmao International Freight Forwarding Co., Ltd. (AFS Logistics Ltd.) — founded in Shanghai on August 8, 2006 with registered capital of RMB 30 million. We specialise in breakbulk, RoRo, special-container and project cargo logistics, with deep roots in the Middle East, Africa, Southeast Asia and India.
We are a licensed NVOCC (non-vessel operating common carrier) and international freight forwarder, a member of the WCA global network (No. 62387) and JCtrans (No. 150978), and a director unit of China's second-hand engineering machinery export alliance.
The business in numbers.
Proof on the hardest lanes.
Sohar, Oman
177 batches shipped between January 2024 and June 2025 — 110 breakbulk, 67 container — into the largest bulk port in Oman.
Mundra, India
37-metre wind turbine blade molds shipped from Shanghai in August 2025 — 7,546 m³ of oversized renewables cargo.
Mtwara, Tanzania
5,939 m³ of steel structures moved Yueyang to Mtwara by river-and-sea transhipment — 72-tonne units, no road leg.
Hamina, Finland
13,033 m³ of modular cold-storage units loaded at Zhangjiagang with precision factory-to-vessel delivery.
Qualified and connected.
NVOCC licence
Licensed non-vessel operating common carrier and Class-A international freight forwarder.
WCA member
Member No. 62387 of the world's largest network of independent freight forwarders.
JCtrans member
Member No. 150978 of the JCtrans global logistics platform.
Industry role
Director unit of China's second-hand engineering machinery export alliance, backed by bank credit certification.
Values that carry 123-tonne units.
Safety first
Iron-shelf protection, waterproof tarpaulin packing and engineered lifting points — because a damaged 123-tonne unit is not a claim, it is a project delay.
Integrity
Bank credit certification and twenty years of repeat project customers.
Professional & efficient
Route engineering, permits and lifting studies handled in-house by our own operations team.
Win-win cooperation
Carrier-neutral bookings and own offices in four cities — advice that serves the cargo, not a carrier quota.
Connect China with the world.
Mission: to be the international logistics provider trusted by customers worldwide.
Vision: connect China with the world — and make specialised cargo transport simpler, safer and more efficient.
Start with one lane.
Most customers begin with a single difficult shipment. That is the right way to test a forwarder.