Stowage factors explained: why your cargo takes more space than it measures

Breakbulk freight is billed on the greater of measurement or weight — but the real number is the stowage factor, and it is rarely the catalogue volume.

Stowage factors explained: why your cargo takes more space than it measures

Quoting breakbulk freight starts with a deceptively simple question: how much space does the cargo take? The catalogue answer — length times width times height — is almost always wrong, and the gap between the two numbers is where most first-time shippers lose money.

What a stowage factor is

The stowage factor is the volume occupied by one tonne of cargo once it is actually in the vessel, including the dunnage, wedges and air that cannot be avoided. It is expressed in cubic metres per tonne. Cargo that packs tightly — steel plates, for example — has a low stowage factor around 0.5. Awkward cargo such as disassembled plant modules can exceed 3.0.

Why the measured volume is not the billed volume

Three forces inflate the real number. First, irregular shapes cannot nest: a transformer on a saddle wastes every cubic metre around its radiators. Second, stowage rules create exclusions — cargo over hatch coamings, clearance for lifting gear, separation between incompatible pieces. Third, pieces must be stowed together on the same bill of lading, which forces compromises a pure volume calculation would never make.

Revenue tonnes, not cubic metres

Breakbulk freight is priced per revenue tonne: the greater of the cargo weight in tonnes or its volume in cubic metres. A 12-tonne crate measuring 18 cubic metres bills on 18 FRT. A 40-tonne transformer in 22 cubic metres bills on 40 FRT. Get the stowage factor wrong and the freight estimate moves by half — usually upwards.

How to estimate it before the survey

Use the catalogue volume and add a shape factor: 10 to 15 percent for regular crates, 25 to 40 percent for machinery with protrusions, and up to 60 percent for disassembled units with mixed piece sizes. The pre-stow survey replaces the estimate with the real number, which is why we schedule it before the quotation is finalised on anything unusual.

What to send for an accurate number

A piece-by-piece list with outer dimensions including skids and bracing, weight per piece, and photographs from four sides. A drawing beats a description every time. With a real list we can give you a freight figure that survives contact with the vessel — and a quotation where the ocean line does not quietly double at loading.

Need this checked against your cargo?

Send the dimensions and the lane. A planner will come back with options.

Get a quote Talk on WhatsApp
Certified & audited WCA Member FIATA NVOCC Licensed ISO 9001:2015 IATA Cargo Agent Customs AEO