Almost every billing dispute we see traces back to one sentence nobody read: the free time clause. Demurrage, detention and storage sound interchangeable. They are three separate clocks, started by three different events, priced by three different rate cards.
Demurrage: the container in the yard
Demurrage starts when a full container stays inside the terminal past its free days. It is charged by the carrier, per container per day, and the rate escalates — day 1 to 4 might cost 30 dollars, day 8 to 10 might cost 150. Free time is typically 3 to 5 days for imports at Middle East ports, and it starts the moment the container is discharged, not when you hear about it.
Detention: the container outside the yard
Detention starts when the container leaves the terminal with the equipment still on hire, and runs until the empty is returned to the depot. Slow stuffing at the factory, customs delay inland, or a depot that is far from the site all feed it. The rate is usually lower than demurrage but it accumulates for as long as the box is out.
Storage: the terminal, not the carrier
Storage is charged by the terminal or port authority for cargo occupying its space — including breakbulk and out-of-gauge cargo that never enters the container system. Rates and free days are completely different from the carrier clocks, and at congested ports storage can exceed the freight. Breakbulk cargo with a lashing survey pending is a classic storage generator.
Why the clocks overlap badly
On a bad week all three run at once: the container waits in the yard accruing demurrage, the truck that finally hauls it gets stuck at customs accruing detention, and the out-of-gauge piece that missed the sailing sits accruing storage. The defence is boring and effective — confirm free time in writing before booking, track discharge dates, and pre-clear documents so customs does not become the expensive variable.
What we do differently
Our quotations list free time at both ends and the daily rates that apply after it. When a delay looks likely, we ask for an extension before the clock passes the free days, not after. Extensions cost a fraction of escalated charges — the trick is to ask while the ask is still cheap.
Send the dimensions and the lane. A planner will come back with options.