Incoterms allocate cost and risk, but they were written with general cargo in mind. Breakbulk adds handling steps that the standard terms do not always make obvious.
FOB
The buyer arranges ocean freight and everything after loading. The seller delivers to the vessel and bears the cost of getting the cargo alongside. For out-of-gauge pieces, the boundary between "alongside" and "loaded" can be expensive, and the lifting cost may fall to whoever controls the crane.
CIF
The seller arranges freight and insurance to the destination port. For breakbulk, the insurance basis matters: Institute Cargo Clauses may not respond to handling damage during a heavy lift unless the cover is written to include it.
DAP and DDP
The seller delivers to a named place, which for project cargo is usually the site. This is where permits, escorts and site access become the seller's problem. It is also where quotations most often under-scope, because the last kilometre was never surveyed.
Practical advice
Name the exact point of delivery, not just the port or city. "DAP Jebel Ali" and "DAP site, 40 km inland" are different shipments with different costs. And state who is responsible for lashing, surveys and permits — the Incoterm alone rarely answers it.
Send the dimensions and the lane. A planner will come back with options.