RoRo is the default answer for anything that drives. It is also the answer most often chosen wrongly, because the constraint is not weight — it is geometry and scheduling. This guide covers what actually decides whether your machine sails on a PCTC.
The geometry checks that come first
Ramp width, ramp angle and internal deck height are physical limits. Deck heights vary by deck level — typically 4.2 to 6.4 metres — and a machine that clears one deck may fail another. Track pads reduce ground clearance, and attachments raise the transport height above the brochure number. Measure with the machine in shipping configuration: buckets down, mirrors folded, aerials removed.
Deck strength and axle loads
RoRo decks are rated in tonnes per square metre. A concentrate-heavy wheel loader can exceed the deck load even when the total weight is modest. We submit axle loads and tyre footprints to the carrier for approval — it takes a day and prevents a refusal at the ramp that costs two weeks.
The sailing rhythm problem
PCTC services run fixed loops, often monthly on regional trades. A machine ready on the wrong day waits four weeks. The fix is planning backwards from cut-off dates, not forwards from factory readiness. Where the calendar is immovable, breakbulk on a multipurpose vessel takes the cargo earlier — at a freight premium that is often smaller than four weeks of idle assets.
MAFI trailers and non-rolling cargo
Machines that do not start travel on MAFI trailers towed across the ramp. It works, but it prices differently, requires a working tow hitch, and needs the weight distributed as the trailer manufacturer specifies. Tell us the unit does not start before the booking, not at the terminal gate.
Where the real savings sit
The freight line is 60 to 70 percent of the landed cost. Terminal handling at both ends and the inland leg are where quotes quietly diverge — one forwarder includes port handling, another does not. Compare the full chain on the same assumptions, and the RoRo advantage stays intact instead of dissolving into surcharges.
Send the dimensions and the lane. A planner will come back with options.