Steel structures — columns, trusses, platforms, bridge segments — move on multipurpose vessels in the thousands of tonnes. The trade is mature, which means the failure modes are well known: edge damage in transit, bundle collapse during double handling, and documentation mismatches that strand cargo at discharge.
Bundling that survives the quay
Members travel in bundles secured with steel strapping over timber dunnage, wrapped at contact points. Bevelled edges and machined faces need hard protection — soft wrapping does nothing against a shifting coil two metres away. Piece marks must be on the outside, repeated at both ends, because discharge crews identify cargo by mark and an unreadable mark is a misplaced segment.
Coating protection is a shipping problem
Painted and galvanised surfaces arrive rejected more often for abrasion than corrosion. Surface contact between bundles is the cause. Separators, edge boards and sensible bundle heights fix it at negligible cost; repainting at site costs a multiple and a schedule. Specify the protection standard in the packing documentation so the surveyor checks against it.
Documentation that matches the steel
The mill test certificates, the packing list and the bill of lading must reference the same piece marks. Customs at destination frequently inspects structural steel against the packing list; a mismatch between listed and actual bundle counts converts a routine inspection into a demurrage generator. We reconcile documents against the physical tally at the load port, before the vessel sails.
Stowage requests worth making
Long members benefit from under-deck stow to avoid weather exposure. Heavy short pieces stow low. Tell us the coating spec and the site sequence — cargo that discharges in erection order saves the receiver weeks, and stowage can be planned around it if we know early enough.
The numbers that matter
Freight is per revenue tonne, typically 45 to 95 dollars on the China–Middle East trade depending on direction and vessel. Lashing and dunnage add a small percentage when quoted separately. The expensive failures are all avoidable ones: repaint, re-handling, and storage during document disputes.