A good export crate is an engineering object: it carries the machine, survives forklifts and cranes, keeps rain off and passes customs inspection. Most packing failures we see are force-path failures, not material failures.
ISPM-15: the customs layer
All wood packaging moving internationally must be heat treated or fumigated and stamped with the ISPM-15 mark: country code, producer number, treatment code. No stamp, no clearance — and treatment at destination costs more than the crate did. Plywood and particle board are exempt; solid sawn wood is not. Every skid, bearer and brace inside the crate counts.
Load paths: where the force goes
The machine’s weight must travel through the skid bearers to the crate base, not through the walls. Bolting the machine to the base through its own mounting points, with the base bearers sized to the lifting points, is the core principle. Crates that hang the machine on wall panels fail at the first forklift tilt. For machinery with high centres of gravity, add internal bracing tied to the base, not to the lid.
Moisture and the six-week question
Vapour barriers, desiccant and ventilated designs compete — the right choice depends on cargo and trade. Condensation inside a sealed crate over a Gulf summer sailing is a corrosion generator; a vented crate with desiccant often beats a sealed one for machinery. Zinc-rich VCI paper for machined surfaces is cheap insurance either way.
Lifting points and marking
Mark lifting points, centre of gravity and fork pockets on the outside, and make them truthful — a marked lifting point that is actually a panel attachment will be used exactly once. Piece marks go on multiple faces and repeat inside on the machine, because outer marks get scraped in transit.
The pre-stow survey
A surveyor checks the crate against the transport plan: lifting points, base strength, weather exposure on deck, and the ISPM-15 stamps. Fail it and the piece misses the vessel. The survey costs a fraction of the slip — and the packing spec, written once, makes every future crate pass it.