Volume cargo with moisture risk.
Timber shipped breakbulk or in containers with moisture and fumigation requirements handled.
Volume cargo with moisture risk.
Sawn timber, logs, panels and wood products.
We plan the handling method around the cargo profile: dimensions, weight, packaging, value and the delivery date the project depends on. That usually means comparing two or three modes before recommending one.
Cargo-specific planning.
Dimensions and weight
The piece decides the mode before the rate does.
Handling equipment
Crane, forklift or MAFI matched to the cargo and the terminal.
Documentation
Export and import documents prepared for the commodity.
Cargo care
Lashing, packing and weather protection specified per commodity.
Sector questions.
Ask before the booking, not after.
Other cargo profiles.
Heavy Equipment & Machinery
Excavators, cranes, loaders and plant moved as RoRo, breakbulk or flat-rack cargo.
Construction & Steel Structures
Steel beams, trusses, prefabricated structures and construction plant.
Energy & Renewables
Wind components, transformers, turbines and power plant equipment.
Mining Equipment
Haul trucks, crushers, conveyors and underground equipment.