Glossary
Freight terms, in plain English.
FRT, MAFI, demurrage, Incoterms and the rest of the vocabulary used in breakbulk and RoRo.
B
- Breakbulk Shipping
- Non-containerised cargo that is loaded piece by piece, typically on multipurpose or heavy-lift vessels.
D
- Demurrage Pricing
- Charges for keeping cargo or equipment beyond the free time allowed.
H
- Heavy lift Shipping
- Cargo beyond the capacity of standard vessel or shore cranes, requiring specialised gear.
- HS code Customs
- Harmonised System classification that determines duty and import controls.
I
- Incoterms Trade
- Standard trade terms defining who arranges and pays for each leg, insurance and duty.
L
- Lashing Operations
- Securing cargo to the vessel or trailer with chains, straps or wire.
M
- MAFI Equipment
- A roll trailer used to move non-self-propelled cargo on and off a RoRo vessel.
O
- Out of gauge Shipping
- Cargo whose dimensions exceed the standard container or vessel slot envelope.
P
- PCTC Shipping
- Pure car and truck carrier, a vessel designed for rolling cargo.
R
- Revenue tonne Pricing
- Freight unit for breakbulk: the greater of cubic metres or metric tonnes.
- RoRo Shipping
- Roll-on/roll-off. Cargo is driven or towed on board through a ramp rather than lifted.
S
- Stowage plan Operations
- The drawing that shows where and how each piece is placed on the vessel.