Tools Support
Get a quote Talk on WhatsApp
CBM calculator
Tools · Volume

CBM calculator

Calculate cubic metres, chargeable weight and container recommendations. Supports multiple packages.

Dimensions
Centimeters (cm)
Inches (in)
Weight
Kilograms (kg)
Pounds (lbs)

Package dimensions

#1

Calculation results

Enter package dimensions and weights, then click Calculate CBM to see volume, chargeable weight and container recommendations.

Note: container capacity estimates assume standard stowage. Actual capacity varies with cargo shape, weight limits and stowage requirements. Contact us for an optimal loading plan.
Reading the results

How to read CBM and chargeable weight.

01

CBM is space, not price

The CBM figure shows how much room the shipment occupies. Freight bills on chargeable weight: carriers compare actual weight with volumetric weight and bill the higher one — written as W/M.

02

Modes use different factors

Air converts volume aggressively (÷6000), so light, bulky cargo shows a much higher air chargeable weight than the scale reads. Sea focuses on volume — cost usually follows the space taken (1 CBM or 1,000 kg per revenue tonne).

03

Load ratio is a planning signal

A small share of a container usually means LCL consolidation makes sense. A nearly full box deserves an FCL price. Treat the result as a starting point, not a rate.

Validate the numbers with a quote
Certified & audited WCA Member FIATA NVOCC Licensed ISO 9001:2015 IATA Cargo Agent Customs AEO