Chargeable weight
Breakbulk bills the greater of cubic metres and freight tonnes. Light, bulky cargo pays for the space it occupies.
Chargeable weight, heavy-lift surcharge and an indicative ocean freight for the lane. A planning number — the quote desk turns it into a bookable rate.
Estimates use 2026 breakbulk market averages. FRT is the greater of cubic metres and freight tonnes.
| Lane | Breakbulk / RoRo (US$/FRT) | LCL (US$/W/M) | 20GP (US$) | 40HQ (US$) | Air (US$/kg) |
|---|---|---|---|---|---|
| China / Asia → Middle East | 75 | 52 | 1,850 | 2,600 | 4.2 |
| China / Asia → Africa | 115 | 68 | 2,400 | 3,400 | 4.8 |
| Intra-Asia → Southeast Asia | 55 | 30 | 950 | 1,350 | 3.2 |
| China / Asia → South Asia | 65 | 55 | 1,900 | 2,700 | 4.0 |
| China / Asia → Americas | 105 | 70 | 2,700 | 4,100 | 5.0 |
| China / Asia → Europe | 85 | 58 | 2,300 | 3,200 | 4.5 |
Heavy lift adds US$900 per piece from 15 t and US$1,800 per piece from 25 t. Customs, duties, insurance and inland delivery are separate.
Rate basis: 2026-11-19 · v2026-11.1
Enter the dimensions and the weight, then calculate.
An indicative all-in range appears here.
Four numbers decide most of the price. Once you can see them, the estimate makes sense — and so does the quotation.
Breakbulk bills the greater of cubic metres and freight tonnes. Light, bulky cargo pays for the space it occupies.
Pieces above 15 tonnes usually need a second crane or a tandem lift. That is a separate line, not a percentage.
MAFI rolls, cradles, lashing and stevedoring are quoted per piece and per port, not per shipment.
Bills of lading, certificates, port dues and agency sit on top of the ocean freight.
The calculator gets you into the right range. A planner confirms the tonnage, the lifting plan and the sailing.
Send the lane, dimensions and date. We reply with routing, validity and exclusions.
Start a quote
See the lanes we run out of China and the typical transit windows before you commit to a date.
Browse lanes
The vocabulary behind the numbers in the quotation.
Open the glossary