工厂临江而建,最优路线便是全程走水路。驳船将钢结构单元从岳阳运至张家港,同一批单元在张家港直接转载至驶往姆特瓦拉的海轮。
"},{"type":"stats","title":"运输概况。","items":[{"value":"2026年6月","label":"驳船段+海运段"},{"value":"5,939 m³","label":"总体积"},{"value":"72 t / 25 m","label":"最重及最长单件"}]},{"type":"features","kicker":"服务范围","title":"我们负责的环节。","items":[{"icon":"shield","title":"内河驳船段","text":"岳阳至张家港驳船运输,免去超限单元的公路许可。"},{"icon":"anchor","title":"直达海运段","text":"在张家港转载至挂靠姆特瓦拉的船舶,并针对72吨单元制定配载方案。"},{"icon":"globe","title":"项目协调","text":"由一个团队统一负责驳船、转载与海运船期,与坦桑尼亚现场进度相匹配。"}]}]
5,939 m³
货物体积
72 t
单件最大重量
25 m
单件最大长度
起运港Yueyang, China
目的港Mtwara, Tanzania
运输方式Breakbulk / barge
行业construction-steel
[{"type":"lead","kicker":"钢结构 / 坦桑尼亚","title":"省去陆运环节的河海联运路线","html":"