A Finnish cold-chain infrastructure programme required complete modular cold-storage units, factory-finished and weather-sensitive. Every unit was packed on iron shelf protection and sealed under waterproof tarpaulin before leaving the plant, so the cargo arrived at Hamina ready for installation.
"},{"type":"stats","title":"Shipment at a glance.","items":[{"value":"July 2026","label":"Loaded at Zhangjiagang"},{"value":"13,033 m³","label":"Total volume shipped"},{"value":"60 t / 16 m","label":"Heaviest and longest unit"}]},{"type":"features","kicker":"Scope","title":"What we handled.","items":[{"icon":"shield","title":"Factory-condition loading","text":"Iron shelf protection and waterproof tarpaulin packaging, then precision delivery of each unit directly from the manufacturer to the vessel."},{"icon":"anchor","title":"Breakbulk ocean freight","text":"Multipurpose vessel space booked carrier-neutral, with stowage planned around the 60-tonne, 16-metre units."},{"icon":"globe","title":"Destination delivery","text":"Customs clearance and final delivery coordinated at Hamina so modules landed on the construction schedule."}]}]
Case study
Modular cold storage units shipped from Zhangjiagang to Hamina
Modular cold-storage units for a cold-chain infrastructure project in Finland, loaded at Zhangjiagang in July 2026. Iron-shelf protection and waterproof tarpaulin packaging, with units delivered with precision directly from the factory to the vessel.
13,033 m³
Cargo volume
60 t
Max unit weight
16 m
Max unit length
OriginZhangjiagang, China
DestinationHamina, Finland
ModeBreakbulk / heavy lift
Industryconstruction-steel
[{"type":"lead","kicker":"Cold chain / Finland","title":"Breakbulk units loaded with millimetre discipline","html":"