When the plant sits on the Yangtze, the smart route is water all the way. Barges carried the steel structure units from Yueyang to Zhangjiagang, and the same units were transhipped directly onto the ocean-going vessel bound for Mtwara.
"},{"type":"stats","title":"Shipment at a glance.","items":[{"value":"June 2026","label":"Barge + ocean leg"},{"value":"5,939 m³","label":"Total volume"},{"value":"72 t / 25 m","label":"Heaviest and longest unit"}]},{"type":"features","kicker":"Scope","title":"What we handled.","items":[{"icon":"shield","title":"River barge leg","text":"Yueyang to Zhangjiagang by barge, avoiding road permits for oversized units."},{"icon":"anchor","title":"Direct ocean leg","text":"Transhipment at Zhangjiagang onto the vessel serving Mtwara, with stowage planned for 72-tonne units."},{"icon":"globe","title":"Project coordination","text":"One team accountable for barge, transhipment and ocean schedules against the Tanzania site programme."}]}]
Case study
Steel structures moved Yueyang to Mtwara by river-and-sea transport
Large steel structure units for a Tanzania project, shipped in June 2026. Barges moved the units down the Yangtze from Yueyang to Zhangjiagang, where they transhipped directly onto the ocean vessel to Mtwara — no land leg, no extra handling.
5,939 m³
Cargo volume
72 t
Max unit weight
25 m
Max unit length
OriginYueyang, China
DestinationMtwara, Tanzania
ModeBreakbulk / barge
Industryconstruction-steel
[{"type":"lead","kicker":"Steel structures / Tanzania","title":"River-and-sea routing that skips the road leg","html":"