Tools Support
Get a quote Talk on WhatsApp
37-metre wind turbine blade molds shipped from Shanghai to Mundra
Case study

37-metre wind turbine blade molds shipped from Shanghai to Mundra

Oversized wind turbine blade molds shipped from Shanghai to Mundra in August 2025. The mold length and weight drove the whole plan — port handling, ocean freight and discharge at destination were engineered around 37-metre pieces.

7,546 m³ Cargo volume
37 m Max unit length
Breakbulk Loading mode
OriginShanghai, China
DestinationMundra, India
ModeBreakbulk
Industryenergy-renewables
[{"type":"lead","kicker":"Wind energy / India","title":"Blade molds moved without a millimetre to spare","html":"

Renewable-energy manufacturing keeps pushing cargo beyond standard equipment limits. For this shipment the 37-metre mold length dictated vessel choice, lashing plan and discharge sequence at Mundra.

"},{"type":"stats","title":"Shipment at a glance.","items":[{"value":"August 2025","label":"Shipped from Shanghai"},{"value":"7,546 m³","label":"Total volume"},{"value":"37 m","label":"Longest mold section"}]},{"type":"features","kicker":"Scope","title":"What we handled.","items":[{"icon":"shield","title":"Ground handling","text":"Low-bed transport from the mold factory to the Shanghai berth, timed against the vessel window."},{"icon":"anchor","title":"Ocean freight","text":"Direct breakbulk space to Mundra with heavy-lift discharge arranged at the Indian port."},{"icon":"globe","title":"Customs & delivery","text":"Export declaration and destination formalities completed for the OEM's project calendar."}]}]
Certified & audited WCA Member FIATA NVOCC Licensed ISO 9001:2015 IATA Cargo Agent Customs AEO