Cement plant equipment is unforgiving: a single mill unit can outweigh an entire container consignment. This 123-tonne, 18-metre unit rolled onto the RoRo vessel at Taicang on MAFI trailers, engineered with four dedicated 40-tonne lifting points for safe discharge at Tema.
"},{"type":"stats","title":"Shipment at a glance.","items":[{"value":"August 2026","label":"Shipped from Taicang"},{"value":"328 m³ / 123 t","label":"Unit volume and weight"},{"value":"4 × 40 t","label":"Engineered lifting points"}]},{"type":"features","kicker":"Scope","title":"What we handled.","items":[{"icon":"shield","title":"RoRo loading","text":"Unit loaded on MAFI trailers at Taicang, sized and lashed for the ocean passage."},{"icon":"anchor","title":"Ocean freight","text":"RoRo service to Tema with heavy-lift capacity confirmed for the 123-tonne unit."},{"icon":"globe","title":"Destination handling","text":"Four 40-tonne lifting points engineered into the unit plan for safe handling at Tema."}]}]
Case study
Cement mill unit shipped RoRo with MAFI trailers from Taicang to Tema
A single oversized cement mill unit shipped to Tema in August 2026 on RoRo. The unit travelled on MAFI trailers with four dedicated 40-tonne lifting points engineered into the transport plan.
328 m³
Unit volume
123 t
Unit weight
18 m
Unit length
OriginTaicang, China
DestinationTema, Ghana
ModeRoRo / MAFI
Industrymining
[{"type":"lead","kicker":"Cement plant / Ghana","title":"One unit, 123 tonnes, four lifting points","html":"