Your cargo, the right route, one team accountable.
Specialised breakbulk, RoRo and project cargo forwarding from China to the Middle East, Africa and South Asia.
Know exactly what is being compared.
How cargo requirements shape the plan.
Real shipments, with the weights, the constraints and the decisions behind them.
Options that fit the cargo and the deadline.
Breakbulk
Carrier-neutral breakbulk bookings for steel structures, machinery, blade molds and cement plant equipment. 177 batches shipped to Sohar alone between January 2024 and June 2025 — 110 of them breakbulk.
Explore Breakbulk
RoRo
RoRo bookings for self-propelled machinery: crawler cranes to Brisbane, cement mill units on MAFI trailers to Tema, buses and trucks across our RoRo network. Deck positions confirmed before the loading date.
Explore RoRo
Project Cargo
Multi-modal project logistics engineered lane by lane: barge-and-ocean steel structures from Yueyang to Mtwara, 37 m blade molds to Mundra, 13,033 m³ of modular cold storage to Hamina. Permits, lifting studies and schedules under one team.
Explore Project Cargo
What are you planning?
A single shipment ready to go
Send the lane, cargo and date. You get a plan and a quote with the scope stated.
Get a quoteRegular imports or exports
Tell us the frequency and volume so the team can design a repeatable lane.
Get a quoteCargo that needs assessing
Out-of-gauge, unusual handling or a customs question — describe it and we will scope it.
Get a quoteSupport before, during and after the sailing.
We compare carriers and handling options against your cargo, and one coordinator connects the confirmed services from first enquiry to final delivery.
One contact from pickup to delivery
Pickup, export handling, ocean or RoRo carriage, customs partners and delivery coordinated by one coordinator.
View service
Storage where the cargo needs it
Short-term storage, cross-docking and consolidation through partner facilities near the main load ports.
View service
Clearance prepared before arrival
Licensed brokers review classification, documents and duties, with Halogis accountable for the process.
View service
Cost planned before the booking
Route choice, landed cost and customs assumptions reviewed before you commit to a mode.
View serviceA plan built around your cargo.
Machines that decide the mode before the rate does.
Bundled steel and prefabricated structures, lashed and protected for the voyage.
Transformers and turbine components routed around cranes, permits and ports.
Cargo that cannot be transhipped twice, planned around discharge capability.
Start with the countries the cargo moves between.
See the transport options and planning requirements on a specific lane. The lane is pre-filled into the quote request.
Plan the next shipment.
Practical guides on mode choice, cost structure and the documents that decide a sailing.
Questions we answer before booking.
If something is unclear, ask before the booking — not after.
All questionsWhat shippers say after the vessel sails
Importers, exporters and project teams we move cargo for — in their own words.
Containers, then a mixed breakbulk top-up when the order grew. Same desk, same people, same weekly report. Consistency is why we stopped shopping around.
Their team flagged a deck strength issue on our palletised load before booking. A cheaper quote we had would have failed the survey. Honest advice, even when it complicates the sale.
Out-of-gauge drums to Callao needed road permits at both ends. Halogis coordinated the inland leg and the vessel so the pieces never sat in the yard. Planning discipline you normally only see on paper.
WhatsApp replies within minutes, even across the time difference. Documentation for customs clearance in Jebel Ali was correct the first time, which saves us weeks.
The quotation broke out lashing, port handling and documents as separate lines. When the invoice came, it matched. After years of surprise charges from other forwarders, this is how it should work.
A 47-tonne transformer to Lagos sounded impossible on our timeline. They compared three vessels, told us plainly which one was realistic, and it sailed on the date they said it would. That transparency is rare.
Our excavators used to arrive with scratched cylinders and arguments about who caused them. Since switching to Halogis, condition surveys happen at both ends and the photos are in our inbox the same day. Claims went to zero.
We ship steel structures from Shanghai every month. Halogis sends the stowage plan before we even ask, and the lashing survey reports arrive with the booking. First forwarder that treats our cargo like a project, not a line item.
Start with your cargo.
Request a quote with the cargo details, or ask a coordinator what happens next.