Crawler cranes are exactly the cargo RoRo was built for. The two main units drove up the ramp at Taicang under their own power, while every component that could not roll — booms, track frames, counterweights — travelled secured on MAFI trailers.
"},{"type":"stats","title":"Shipment at a glance.","items":[{"value":"June 2026","label":"Shipped from Taicang"},{"value":"2 units","label":"Crawler cranes delivered"},{"value":"43 t / 14 m","label":"Heaviest and longest unit"}]},{"type":"features","kicker":"Scope","title":"What we handled.","items":[{"icon":"shield","title":"RoRo loading","text":"Main bodies rolled on under own power; components secured on MAFI trailers for the passage."},{"icon":"anchor","title":"Ocean freight","text":"RoRo service booked to Brisbane with deck positions confirmed before the loading date."},{"icon":"globe","title":"Customs & delivery","text":"Export formalities and Australian biosecurity-ready documentation prepared ahead of arrival."}]}]
Case study
Crawler cranes rolled from Taicang to Brisbane under RoRo
Two crawler cranes shipped to Brisbane in June 2026. Main crane bodies rolled on board under their own power; booms, tracks and components were secured on MAFI trailers — the standard RoRo discipline for self-propelled heavy plant.
2 units
Crawler cranes
43 t
Max unit weight
14 m
Max unit length
OriginTaicang, China
DestinationBrisbane, Australia
ModeRoRo
Industryheavy-equipment
[{"type":"lead","kicker":"Construction machinery / Australia","title":"Roll-on, roll-off, nothing left to chance","html":"