Case studies
Cargo we moved, with the numbers attached.
Weights, transit times and the decisions that made the difference — written by the coordinators who ran them.
Modular cold storage units shipped from Zhangjiagang to Hamina
Zhangjiagang, China → Hamina, Finland
construction-steel Read the case
37-metre wind turbine blade molds shipped from Shanghai to Mundra
Shanghai, China → Mundra, India
energy-renewables Read the case
Steel structures moved Yueyang to Mtwara by river-and-sea transport
Yueyang, China → Mtwara, Tanzania
construction-steel Read the case
Crawler cranes rolled from Taicang to Brisbane under RoRo
Taicang, China → Brisbane, Australia
heavy-equipment Read the case
GDS modular units trucked from Shenzhen to Hong Kong under Z-plate permits
Shenzhen, China → Hong Kong, China
heavy-equipment Read the case
Cement mill unit shipped RoRo with MAFI trailers from Taicang to Tema
Taicang, China → Tema, Ghana
mining Read the case